Your Cart

×
Loading...

Draft determinations for wages published

Each financial year the Fair Work Commission reviews and sets minimum wages. These are the draft determinations for the Annual Wage Review 2021–22.

Minimum wage rates draft determinations

On 15 June 2022, the Expert Panel of the Fair Work Commission issued the Annual Wage Review 2021–22 decision [2022] FWCFB 3500 to change modern award minimum rates.

For most awards the changes will take effect from the first full pay period that starts on or after 1 July 2022.

Expense-related allowance draft determinations

Commission staff have prepared draft determinations adjusting expense-related allowances in modern awards for the applicable Consumer Price Index figure.

The draft expense-related allowances determinations for the awards being changed on 1 October 2022 will be published on 12 August 2022, as outlined in Statement [2022] FWCFB 99. Interested parties will be able to comment on those drafts at that time.

Draft determinations

Draft modern award wage determinations have been prepared, taking into account the Expert Panel’s decision, and draft expense-related allowance determinations for review and comment.

Gardening and Landscaping Services Award

Current Award

Allowances Draft

Wages draft

Building and Construction General On-site Award

Current award 

Allowances Draft 

Wages Draft 

Horticulture Award 

Current award

Allowances Draft

Wages Draft

Nursery Award

Current Award

Allowances Draft

Wages Draft 

Any corrections or amendments to the draft determinations below must be emailed to amod@fwc.gov.au no later than 5pm on Friday, 24 June 2022.

For more information please visit the Fair Work Commission page.

Comments

Comments posted to this page are moderated for suitability. Once your comment has been checked it will be uploaded to the site.

Terms and Condition

These Terms and Conditions must be read in conjunction with TLA’s Privacy and Copyright Policy Statements.

Descriptions of contracts contained on this website are a guide only and do not outline a specific fitness for purpose. The Landscape Association gives no representation or warranty about suitability of a particular contract for a specific function.

The Landscape Association does not accept responsibility for loss or damage suffered by any person or body relying directly or indirectly on any information contained within the pro forma contracts or the LNA Master Landscapers Rates Guide Schedule of Rates for Landscape Works. All contracts and Guides are purchased at the risk of those making the purchase.

TLA does not have access to the customer’s credit card number which is encrypted for security purposes. The credit card will be debited at the time of processing the payment. A tax invoice/receipt will be automatically generated and emailed to the customer.

Orders are ordinarily dispatched by Australia Post, Express Post, within seven working days. Five days should be allowed for delivery. This timeframe is indicative only. Every reasonable effort will be made to notify the customer if a delay is expected.

Provided an order has not been dispatched, it may be cancelled in full or part by calling The Landscape Association on (02) 9630 4844. Returns are not accepted by The Landscape Association unless the customer has received an unordered or faulty item, or unless otherwise required under Australian legislation.

The Landscape Association reserves the right to change these terms and conditions at any time.

a a a